Eramurra Production Scenarios.

1. Stand-Alone Operation
1.6 Mt - Low risk approvals process

2. Citic Desalination Integration
2.5 Mt - Australia's lowest cost operation

3. BCI Mardie Integration
4.1 Mt - Australia's largest operation

Eramurra Colour.jpg
Proposed Wharf and Loading.jpg

Proposed Wharf & Loading.

Cost effective brine pumping and direct loading

  • Pumping of final product as a slurry to loading point
  • Salt extracted by centrifuge/drying for direct loading
  • No conveyors, machinery, train or trans-shipping